Connection standards
Requirements for connecting to the Orion network
To allow us to maintain the safety and quality of the electricity distribution network, prior to livening, your connection must comply with the following documents:
- the Orion Network Connection Standard
- the Electricity Act 1992 and associated codes of practice
- the Electricity (Hazards from Trees) Regulations 2003
- the Electricity (Safety) Regulations 2010
The authorised livening contractor will confirm compliance with these documents at the time the installation is livened.